Last project to remodel

I love remodeling projects.

I have gone from room to room in our home and renovating the spaces.

I love tiling, painting and moving things around. The last room in the home is the main bathroom. I am excited since the space needs a lot of love. I don’t need to do any major layout changes, although I want all new stuff. My storage unit in the bathroom is too small and ugly. I want to get an IKEA storage unit. My sink vanity needs a better countertop and more storage. I want a new tub, shower controls, shower heads and toilet. I even method to get new tile floors and tile around the shower area. I am going to spend quite a bit of cash in the Heating plus A/C department too. First, I want to add bathroom ventilation. I hate the stuffy, boiling air after a shoer. I hate that mold grows abruptly and the bathroom smells. It makes sense to disconnect the heat from the home and introduce some fresh air. I also have a ductless Heating plus A/C unit in the house. Each room has its own indoor air handler and thermostat. I did not think the main bathroom needed one. It is large enough that it absolutely does require Heating plus A/C. I need to get our Heating plus A/C specialist over to add a unit and a thermostat. It shouldn’t be much cash since he is connecting the component to the existing outdoor air compressor. It will be so nice having heating and air in the space. I won’t be freezing cold taking a bath in the Winter time anymore.

a/c products